Other Services

INTERIOR
MEP

Brochure

Benefit of the socie where we oper ate success for the website done

Need help?

Shed 06, Aber Warehouse
Dubai Investment Park 02,
PO Box: 414345 , Dubai.
United Arab Emirates.

Mobile: +971 50 2420957
Email: [email protected]

Substation Construction Services

There should be a specialized substation, site preparation, foundation, and construction in order to offer structural integrity assessment; the installation of all kinds of equipment support system such is the Voltronix scope of works that holds on safety and quality on delivery meeting industry standards and makes infrastructure reliable enough to provide efficient power distribution.

Wide-range substation service performance in efficiency

  • Crop land clearing and grading.
  •  Groundwork and structural principles.
  • Underground cable burial.
  • foundation Transformer pads.
  • Perimeter security fencing.
  • Water management infrastructure.
  • Suitable site-access roads.

Here’s how we work

We at our civil construction company provide complete substation services that include site preparation, foundation construction, and structural integrity assessment.

 

  • 1
    Initial planning: Conduct a site survey and scrutinize project specifications according to the law and regulations.
  • 2
    Design & Engineering: Architectural and Electrical Designs, with details from the project requirements and industry standards.
  • 3
    Site preparation: It includes clearing all the place clearing processes, laying foundations, and construction preparation to ensure effective and safe construction.
  • 4
    Construction and Installation :Construct the substation structure on schedule and install major equipment.
  • 5
    Testing & Commissioning: Severe testing, Operational capability validation, and handing over the constructed substation, operational and ready for use.

FAQs

 We build transmission, distribution, and modular substations with diverse characteristics catering to individual energy requirements and specific project requirements in most cases.

The construction time is based on the size and complexity of the project. Usually, it takes several months up to a year. Detailed timelines are provided during consultation.

 We ensure safety by using strict protocols such as thorough risk assessments, personal protective equipment, and industry safety regulations on every construction site.

Yes, we provide after the project completion maintenance and support services toward ensuring that your substation gives optimal performance and solving eventual issues that may come forward.