Understanding Trakhees Approval

Trakhees is the regulatory arm of the Ports, Customs, and Free Zone Corporation (PCFC) in Dubai, overseeing construction and environmental health and safety (EHS) standards. Trakhees approval is essential for ensuring that all projects within Trakhees jurisdictions adhere to the strict guidelines and regulations set forth by the authority. At Voltronix, we help clients navigate the Trakhees approval process, ensuring their projects meet all required standards.

Requirements to be a Trakhees - EHS Certified Contractor

  • Active Trade License: The company must hold a valid trade license with a minimum of six months remaining before expiration.
  • Staff Documentation: Submission of resumes for locally based personnel, including engineers and architects.
  • UAE Residency Proof: Copies of passports with UAE residency visas for all key personnel.
  • Educational and Professional Qualifications: Attested documents verifying academic achievements and professional certifications.
  • Quality Certification Copy: Provision of a copy of any quality certifications held by the company.
  • Authority Approvals: Evidence of approvals from relevant local or international authorities.
  • Experience Record: A summary showcasing the company’s experience in similar projects, demonstrating a proven track record.
  • Registration Fee Payment Proof: Receipt or proof of payment for the registration fees.
  • Legal Status Declaration: A statement disclosing any history of blacklisting or legal disputes with any agencies, both local and international.
  • Local Presence: The company must have a physical office location within the UAE.

Trakhees Approval Process

The Trakhees approval process involves several key steps:

  • 1
    Initial Application: Submit a comprehensive application to Trakhees, including detailed project plans and specifications.
  • 2
    Document Review: Trakhees reviews the submitted documents and may request additional information or modifications.
  • 3
    EHS Inspection: An EHS inspector from Trakhees visits the site to ensure compliance with safety and environmental regulations.
  • 4
    Approval Issuance: Upon successful inspection and review, Trakhees issues an approval certificate.
  • 5
    Final Inspection: After project completion, a final inspection is conducted to ensure full compliance with Trakhees standards.

Documents and Drawings Required for Trakhees-EHS Fit-Out Approvals

Other Authority Approval
FAQs

Yes, we are experts in projects for modernizing and upgrading substations. Our experts can evaluate your current substations, finds areas of development, and suggest changes to boost their effectiveness, dependability, and safety. To enhance the performance of substations, we have expertise in combining the latest technologies and automation systems.

Substation testing and diagnostics are crucial for identifying problems, guaranteeing optimum performance, and avoiding unanticipated breakdowns. These tests assist in spotting anomalies, evaluating the state of the apparatus, and confirming the precision of the protection mechanisms.

 

Yes, we know that each substation project has specific needs. To make sure that our solutions meet their requirements and produce the best outcomes, we work closely with our clients to understand their objectives, financial constraints, and technical demands.

Substation performance and dependability must be maintained regularly. This type of substation, its age, and the unique needs of the electrical system are just a few of the variables that affect how frequently maintenance is performed. The best maintenance schedule for your substation can be determined by consulting our specialists and according to industry standards.

Need help?

Shed 06, Aber Warehouse
Dubai Investment Park 02,
PO Box: 414345 , Dubai.
United Arab Emirates.

Mobile: +971 50 2420957
Email: [email protected]

Need Help?

WANT TO JOIN US?

 Explore our current job openings and take the next step in your career.